Modelling provides asset improvement program for water network

Monday, 15 April, 2019 | Supplied by: Bentley Systems Pty Ltd

Modelling provides asset improvement program for water network

When the water utility for the state of Pahang, Malaysia needed a comprehensive study conducted of the water supply system for a mid-sized town in the area, it appointed Minconsult Sdn Bhd. There were nine water treatment plants (WTPs) with a total capacity of 55,470 m3 per day, providing water to 20,186 consumers. These plants were old and in poor condition, containing antiquated and inefficient technology. As a result, the Pahang area faced water shortages and supply pressure was low and inconsistent, often taking one week to restore water supply.

Minconsult was responsible for reviewing and studying water demand in the district and making projections of the water demand up to year 2030. The project team also needed to review and analyse the existing WTPs and propose upgrading works to meet water quality standards and increase capacity to serve the projected population growth. The organisation also examined the WTPs and suggested new pipeline installation and storage reservoir refurbishment. These changes to the WTPs would improve the facility to satisfy the projected demand. Additionally, Minconsult proposed new WTPs be erected where necessary to augment the water supply system, and the project team was responsible for surveying the land at these sites. The project had a short deadline of six months.

Minconsult has provided multidisciplinary engineering and project management capabilities since 1980 and is one of the most respected firms of independent project managers and consulting engineers in Southeast Asia. Its role in the project was to provide consultancy services to carry out the comprehensive study of the existing water supply system, to identify weaknesses and shortfalls, and to propose economic solutions. The project team’s study and recommendations would alleviate many of the problems with the supply system and ensure that water disruptions and shortages would not reoccur.

The deliverables and expected outcomes would include the proposed asset replacement and refurbishment and the cost plan with proposed scheduling up to 2030. However, the team faced many challenges, including a very old water network, a tight deadline of six months, and a limited core team of one team leader, one modelling specialist and two engineers. Team members also needed to schedule asset improvements and construction so that funding would be distributed without straining the financial resources.

To overcome these challenges, Minconsult leveraged Bentley’s WaterCAD to develop the improvement plan. To help users consider many different situations and possible design options, the team used the application to analyse 28 various design and operation scenarios and compare them using scenario management and graphing, improving the decision-making process. What-if scenarios, criticality and isolation valve features were instrumented in the network system analysis.

One way that the Minconsult team incorporated successful modelling in the project was to ensure that the data used was accurate and up to date. This aspect was important because various groups and stakeholders needed to access the same database for information. By keeping everything in a central location, it decreased confusion and increased confidence in the data. WaterCAD allowed users to export and import data to and from CAD and spatial databases. Exchanging and updating data could occur quickly, without losing data or creating errors. Future refurbishment of water assets could easily be captured and shared across various software platforms.

The team saved resource hours because WaterCAD helped reduce the timeframe and staff input by more than half. Data import and export made it easy to share data across the team and with stakeholders, while isolation valves and criticality features helped to quickly segment models into DMA zones. Leveraging WaterCAD allowed users to automatically develop the hydraulic network from an ArcGIS spatial database and AutoCAD drawings, eliminating the need for manual work. Minconsult completed the project within the original deadline of six months, reducing costs.

By also examining water demand on the existing water pipe network and reservoirs, the projection produced more realistic results based on a more probable water growth demand and consumption. The simulation of the 28 different scenarios also resulted in a more realistic water network improvement. The water asset improvement proposal had the lowest possible cost to the company and a much smaller carbon footprint for the surrounding environment.

The project also resulted in benefits for the local community. The project provided advance-planning capabilities for CAPEX management and planning to the utility company and the state government, which manages all its water supply networks and resources. The state is now quickly aware of any issues with the existing system and able to allocate the necessary resources. Effective water assets will be built on time, reducing the amount of shortages to the people and industries within the water network. A robust and reliable water infrastructure leads to better economic and industrial growth, which benefits the local community.  

Image credit: ©stock.adobe.com/au/pinkomelet

Online: www.bentley.com
Phone: 1800 500 227
Related Products

NORDCON Windows v3.0 drive management software

NORD Drivesystems has released an updated NORDCON software version for Windows with a...

Belden PROVIZE Suite network management software

Belden has announced the release of its PROVIZE Suite, a network management software suite for...

Siemens Senseye Predictive Maintenance

Siemens Senseye Predictive Maintenance has been updated with new features.


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd