Factory upgrade safeguards long-term gelatine production

Friday, 27 July, 2018 | Supplied by: Rockwell Automation Australia

Factory upgrade safeguards long-term gelatine production

Gelatine is a multitalented ingredient for countless applications. It is a key ingredient in gummy candies, marshmallows, yogurts, desserts and much more. Food applications are perhaps the best known examples but they’re not the only ones with pharmaceuticals, emergency medicine and photographic films also utilising gelatine products.

Derived from the collagen found in the bones, connective tissue, and skin of pigs, cattle, and other animals, gelatine manufacturers must adhere to stringent national and international food processing requirements. These regulations include, but are not limited to, cleanliness of the plant, equipment; and define allowable percentages of additives, flavourings, and colourings.

To help safeguard future production of a large-scaled gelatine manufacturing plant, an innovative risk management approach was undertaken to identify and subsequently replace legacy equipment with assistance from Rockwell Automation.

The ultimate goal was to identify and replace legacy equipment with minimal interruption to production.

The existing legacy DCS was over 15 years old and although it was still in operation, if it were to malfunction or breakdown, there was limited ability to have it operational in a timely manner which presented a production risk too great to ignore.

A vendor selection process was undertaken by the manufacturer to assess new technologies that could provide an effective solution for the plant’s requirements. Through this process it was identified that the Rockwell Automation PlantPAx system was the most appropriate choice for this application.

The PlantPAx process automation system is built on a standard-based architecture using Integrated Architecture components. This system helps operators make faster, informed decisions and respond quickly to changing demands. It utilises a common automation platform for seamless integration to increase efficiencies and productivity.

The PlantPAx system connects process, discrete, power, information and safety control into one plant-wide infrastructure, leveraging EtherNet/IP as its backbone. As a result real time information is readily available throughout the enterprise.

According to Sean Doherty, account manager – Food & Beverage at Rockwell Automation, “In addition to the technology capabilities provided by the PlantPAx solution, a key focus for this project was to design a solution to meet the requirements of the plant, while minimising any production loss and operational risks associated with the changeover to the new system.”

In the first stage of the project, the Rockwell Automation Global Solutions team were engaged to conduct a Front End Engineering and Design (FEED) specification. As part of this process, technical specifications, scope definition, and risk assessments were evaluated to reduce overall project risks and execution time.

“We conducted a thorough site audit at the plant and documented the existing system and current processes. As part of this, we also consulted with the manufacturer to understand the key requirements of the system and the end-user specifications,” explained Doherty.

To address concerns around risk mitigation, an additional level of testing was introduced for the system with detailed Factory Acceptance Testing (FAT) being conducted at the Rockwell Automation facility. The plant operators were actively involved in the review process and hands-on training as well as testing of the system was conducted to make sure it was functioning to meet all expectations.

The testing was conducted over a two week period to help mitigate any hardware risks and validate it was fully tested and the entire system was working as intended.

When replacing a legacy DCS system, if the field wiring is replaced simultaneously a significant risk is introduced. In this particular manufacturing plant there were approximately 1500 I/O or approximately 4000 wires in the system, which needed upgrading.

“To have someone disconnect 4000 wires and manually reconnect them, the odds are that some of them are not going to be connected correctly, some of them may be back-to-front or loose. This would then add over a week to the commissioning team because you would have to go and test every single field connection,” explained Doherty.

“To avoid this, we developed an I/O adaptor card that would allow us to remove the old DCS and module and replace it with our proprietary designed module so we could signal through our system without having to change the I/O wiring. This reduced the changeover time significantly,” he said.

This project highlights the importance of careful planning and risk mitigation to deliver a successful outcome. From the initial stage of working together to document existing functionality to testing and commissioning, the new system was integrated seamlessly and three days ahead of schedule.

Within a turnaround time of approximately four days, there was a very smooth transition to the new system and the factory was manufacturing A-grade quality gelatine.

Originally published here.

Online: www.rockwellautomation.com/en-au.html
Phone: 03 9757 1111
Related Products

Alfa Laval ThinkTop V55 diaphragm valve control unit

Designed for Alfa Laval diaphragm valves, the slim profile of the ThinkTop V55 is designed to...

Siemens SIMOCODE M-CP motor management system

Siemens has launched SIMOCODE M-CP motor management system designed for motor control centres.

Rotork IQ3 Pro valve actuator with Ethernet

Rotork has introduced a fully integrated Ethernet actuator compatible with EtherNet/IP, Modbus...


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd