Fortescue announces involvement in green iron smelting joint venture


Tuesday, 20 December, 2022

Fortescue announces involvement in green iron smelting joint venture

Fortescue Metals Group (FMG) has announced that Primetals Technologies, together with its strategic partners Mitsubishi Corporation, FMG, and Austrian steel and technology group voestalpine, have signed an MoU aimed at designing and engineering an industrial-scale prototype plant with a new process for net-zero-emission ironmaking at the voestalpine site in Linz, Austria. The collaboration will also investigate the implementation and operation of the plant.

The new ironmaking process will be based on Primetals Technologies’ HYFOR and smelter solutions. HYFOR is the world’s first direct reduction process for iron ore fines that will not require any agglomeration steps, like sintering or pelletising. A pilot plant has been in operation since the end of 2021, and Primetals Technologies has run numerous successful test campaigns over the last year including successful trials on Fortescue’s Pilbara iron ore products.

The new smelter technology from Primetals Technologies is a furnace powered by electrical energy. It is used for melting and final reduction of direct reduced iron (DRI) based on lower-grade iron ores. In that way, it produces alternative green hot metal for the steelmaking plant.

“voestalpine has a clear plan to decarbonise steel production with the greentec steel program,” said Hubert Zajicek, Member of the Management Board of voestalpine AG and Head of the Steel Division. “An important first step is the incremental shift from the blast furnace route to a hybrid-electric steel pathway from 2027.

“Over the long term, our mission is carbon neutral steel production using green hydrogen, for which we are already undertaking intensive research into promising breakthrough technologies. With the joint project with Primetals Technologies and Fortescue, we are taking another new path towards achieving the goal of CO2-neutral steel production by 2050.”

“This is a decisive step for the transition to green steel production, and we are very excited to be a key part of it,” said Dr Alexander Fleischanderl, Senior Vice President and Head of Green Steel at Primetals Technologies. “Our HYFOR technology is a result of decades of work in the direct reduction and hydrogen space. The smelter is another game-changing green technology we are developing. By combining these solutions, we will enable a sustainable technology for green ironmaking over the long term.”

Fortescue’s main responsibility in the new project is to provide knowledge about iron ore quality and preparation. In addition, Fortescue will supply various iron ores for the new plant.

Fortescue Future Industries (FFI) CEO Mark Hutchinson said the partnership was the perfect alignment of the company’s mining and renewable energy goals.

“Fortescue has more than two decades of expertise in the iron ore industry, rising to become one of the world’s lowest cost exporters, now shipping more than 180 million tons of iron ore a year,” he said. “Global demand for iron ore and steel will remain strong for years to come, but we need cleaner, greener industry powered by green energy to eliminate emissions.”

The project planning phase will be used to design an industrial-scale prototype plant with a capacity of between three to five tons of green hot metal per hour. It is the first solution to link a hydrogen-based direct reduction plant for iron ore fines with a Smelter.

The main goal of the project planning phase is to develop a basis for the decision to realise a prototype plant capable of continuous operation, and then to gain the know-how needed for the next step: a commercial full-scale plant. Another target is to investigate the use of various types of iron ores to produce DRI, hot briquetted iron (HBI) and hot metal and, as a next step, draw conclusions about the individual process steps as well as different combinations of them.

The hydrogen used in the new plant will mainly come from Verbund, Austria’s leading renewable energy producer, which operates a proton exchange membrane (PEM) electrolyser named H2Future. Located in Linz, this plant has a capacity of over 6 MW, and is still the world’s largest of its kind used at a steel plant. The H2Future plant will be upgraded to allow for the compression and storage of hydrogen gas before use in the combined HYFOR and smelter plant.

Related News

Major US defence company sets up in SA

US defence technology company Sierra Nevada Corporation has opened an Australian subsidiary, SNC...

Queensland boosting local manufacturing

The Queensland Government has announced it will boost homegrown manufacturing with an expansion...

Hazer completes testing of its commercial demonstration plant

Hazer Group has announced that it has completed testing of its commercial demonstration plant for...


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd